PHG Energy and General Electric Provide Renewable Power to West Tennessee City

NASHVILLE, Tenn., Dec 18, 2013 (BUSINESS WIRE) — The first commercial collaboration between PHG Energy (PHGE) of Nashville and GE Power & Water business of the General Electric Company GE is officially online and creating electricity from waste materials at a new Covington, Tenn., facility.

GE’s Clean Cycle* generator, based on the Organic Rankine Cycle (ORC) technology, produces power by utilizing heat delivered through PHGE’s downdraft gasification system and waste-mixing process. The two companies successfully proved the coupling of the technologies in an extensive research and development project that resulted in the first collaboration. Now the system is deployed and functions using the city’s wood waste and sewer sludge. Previously both waste streams had been transported and dumped into landfills at considerable cost to the city.

Leave a Reply

Your email address will not be published. Required fields are marked *

Reload Image
Enter Code*: