Agenda for Affordable Solar Workshop December 7th

Date: December 7, 2012 Time: 9 a.m. until 4 p.m. Location: U.T. Conference Center, Knoxville TN
Corner of Locust St. and Clinch Ave.


Statement of the Problem to be Addressed: The average homeowner in the TVA region cannot afford the upfront cost of solar systems for their homes. Recent surveys of rural Tennessee show the strong support for solar but Tennesseans that contributes 60% of TVA’s income are on the average 20% below the typical U.S. income. So Tennesseans want solar but cannot afford solar in today’s economic climate. What can we do to make solar affordable without subsidies?

10 min – introductions TSEA/TREEDC

60 min – Main Speaker: S. David Freeman

120 min – morning breakout

Selecting members for each group and choosing a group discussion leader
What is expected from each group and discussing what is the purpose of each question to be addressed the subjects to be discussed

Group 1: Distributor Issues
a. Collection issues
b. Transfer to TVA mechanism
c. Compensated expenses
d. Future distribution upgrades
e. Location opportunities
i. Locally by distributor
ii. Regionally by TVA
iii. Rooftops

Group 2: Installer issues
a. Initial thoughts on what David said and the proposed program.
b. Preference for local distributors
i. Requirement for local labor?
ii. Could be a small business set aside
iii. Size limits depending on location

Group 3: TVA issues
a. Initial thoughts on what David said and the proposed program
b. Effects on rates
c. Collection issues
d. Accounting issues
e. Who makes the decision to location of array?
i. Distributors
ii. TVA
iii. County
iv. Local Government
f. Any charter issues?
g. Management of program
h. Locating and sizing installed solar farm
i. Expenses incurred for TVA infrastructure
i. Charging for energy storage (who pays and how is the released power priced?)
ii. Financing
iii. Manpower
iv. Other

1 hour – Lunch / Lunch Speaker: Professor Rupy Sawhney

120 min – afternoon breakout

1. Each group continues discussion
a. Arrive at consensus on each area
b. Prepare report back to general session

2. Report back to attendees
a. Distributors
b. Installers
c. TVA
Follow-up and Future Plans

Leave a Reply

Your email address will not be published. Required fields are marked *

Reload Image
Enter Code*: